Skip to content
HaulTerminal

Container per diem calculator: what a slow empty return costs

Enter how many days the container has been out, the free days and the daily rates from the line's tariff. See the per diem owed, the chassis rental, the total, and what one more day would add.

By , Truck dispatcher / Updated October 2026

CONTAINER (EXAMPLE DEFAULTS)

days

Out-gate to empty return

days
$/day
day

0 = one rate only

$/day

CHASSIS

$/day

0 if the chassis is supplied

days
PER DIEM / CHASSISRESULT
Per diem: 3 days at $150
$450.00
Chassis: 7 days at $40
$280.00
Cost of one more day
$190.00
Total per diem and chassis$730.00

DAY BY DAY

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7

Grey: free. Amber: first rate. Red: second rate.

This box costs $730.00 in per diem and chassis. Holding it one more day would add $190.00. Our desk plans the empty return and street turns so equipment goes back inside free time, and every rate con comes to you to sign.

Plan my empty returns

Per diem is the meter that runs on a container once it leaves the terminal. Inside the free days it costs nothing. After that, every day is billed at the ocean line's rate, often with a higher tier later, and the chassis under it may be billing by the day too. This container per diem calculator, also a container detention calculator, adds it up so you can see what a slow empty return, a closed warehouse or a missed appointment really costs.

How it is calculated

  • Days out = days from the out-gate at the terminal or ramp to the day the empty (or the export) goes back in
  • Charged days = days out − free days (never below zero)
  • Per diem = charged days at the first rate, and any days on or after the second-rate day at the second rate
  • Chassis = (days out − chassis free days) × chassis daily rate
  • Total = per diem + chassis

How a line counts days (calendar days or working days, and whether the out-gate day counts) is set in its tariff. Enter days the way your tariff counts them. All rates in the tool start as EXAMPLE values; replace them with the rates from the line's tariff and the chassis provider's rate sheet.

A worked example

EXAMPLE / 10 DAYS OUT, TIERED RATEEXAMPLE
Free days
4
Days 5 to 8 at $150
$600
Days 9 to 10 at $200
$400
Chassis, 10 days × $40
$400
Per diem and chassis$1,400

A receiver that cannot unload for six days turns a four-day free window into $1,000 of per diem, plus $400 of chassis. The full line-by-line view of a container move is in drayage rates.

Who pays, and how to protect yourself

Per diem is billed by the container's owner, usually the ocean line, to the party in its contract. That party then looks for whoever held the box. For a trucker, the protection is paperwork:

Before the moveAfter the move
Get the free days and return location in writing on the rate conKeep the out-gate and in-gate receipts (equipment interchange records)
Ask who pays per diem if the receiver holds the boxNote the time the receiver was told the box was empty
Ask whether the chassis is supplied or rented by youBill any agreed per diem pass-through promptly

Under the FMC's billing rule (46 CFR 541.7), an ocean carrier or terminal must issue a demurrage or detention invoice within 30 calendar days of the date the charge was last incurred, or the billed party does not have to pay it. Keep the dates; they matter if a bill shows up late.

Chassis per diem and the UIIA

Containers and chassis are interchanged to motor carriers under the UIIA, the industry agreement run by IANA. Each equipment provider adds its own terms, including free time and per diem. How interchange works for pool trailers and containers is in trailer interchange, and the chassis itself sits with the other equipment in types of truck trailers.

Ways to keep per diem down

  1. Plan the empty return before you deliver. Know the return location and its gate hours.
  2. Street turn when allowed. Reuse the import empty for a nearby export instead of returning it.
  3. Watch the receiver. If unloading is slow, tell the broker in writing the day free time will run out.
  4. Check chassis days separately. A chassis split or a chassis held at a warehouse bills on its own clock.

Our desk tracks free time on every container load and plans the next move around the empty return; see how dispatch works.

Results are estimates from the numbers you enter. Your tariff and contract decide what is owed.

SOURCES

Questions about this tool

01How is container per diem calculated?

Count the days the container has been out of the terminal, subtract the free days in the tariff or contract, and multiply the rest by the daily rate. Many lines charge in tiers, with a higher rate after a set number of days, so this calculator lets you add a second rate and the day it starts.

02What is the difference between per diem and demurrage?

Demurrage is charged while a loaded container sits too long inside the terminal. Per diem, also called detention, is charged when the container is out of the terminal too long before it comes back empty, or loaded for an export.

03Who pays container per diem?

Whoever the contract makes responsible. Ocean lines bill the party on their bill of lading or contract; that cost is often passed to whoever caused the delay. A drayage carrier that returns an empty late can be billed for it, which is why free time and return dates belong on the rate con.

04How long does an ocean carrier have to send a detention invoice?

Under the Federal Maritime Commission's rule at 46 CFR 541.7, a billing party must issue a demurrage or detention invoice within 30 calendar days of the date the charge was last incurred. If it does not, the billed party is not required to pay the charge.

Every box back inside free time

We plan the empty return and street turns before the container delivers, so per diem does not eat the move. Every rate con goes to you to sign or decline.

  1. YOU ARE HERE

    Plan my empty returns