When diesel moves, a fuel surcharge is what keeps a contract rate from turning into a loss. It is also one of the least understood lines on a rate con. This fuel surcharge calculator shows how the surcharge is worked out and, more usefully, how much of your actual fuel bill it pays.
How to calculate FSC
The per-mile method most schedules use:
- Price above base = current diesel price − base price in the schedule (zero if diesel is below the base)
- FSC per mile = price above base ÷ MPG in the schedule
- FSC per load = FSC per mile × loaded miles
Some schedules move in steps, for example every 5 or 6 cents of diesel price, instead of exactly. The calculator can round the way your schedule does.
To see what the surcharge covers, it compares the FSC per mile with your real fuel per mile, which is the current price ÷ MPG.
A worked example
- Diesel $6.382, week of Sept 28, 2026
- $5.132 above base
- ÷ 6 mpg
- $0.855/mi
- × 1,000 loaded mi
- $855
- Fuel actually costs $6.382 ÷ 6
- $1.06/mi
The other 20 cents a mile comes out of the linehaul. If the truck actually gets 6.5 mpg, real fuel is 98 cents a mile and the surcharge covers more of it; at 5.5 mpg it covers less.
Reading a fuel schedule
| Term | What it means for you |
|---|---|
| Base price | Fuel the linehaul is assumed to cover. Lower is better for the carrier |
| MPG | Lower MPG in the schedule pays more surcharge per mile |
| Index | Which EIA region and which week sets the price |
| Steps | Whether the surcharge moves exactly or in 5 or 6 cent steps |
| Miles | Usually loaded miles only; deadhead fuel isn't covered |
Where the surcharge stops
Deadhead, reefer fuel and idling aren't usually covered. Reefer burn adds its own cost, explained in reefer units, and a whole trip's fuel bill is in the trip fuel cost calculator. Buying in the right states lowers the price you pay, which the where to fuel calculator helps with. Power only rates and how fuel fits into them are in power only rates per mile, and our approach on power only dispatch.
Results are estimates from the numbers you enter. Your contract's schedule is what counts.
SOURCES